Case Study

Whitney Young Manor

Recapitalization to achieve carbon neutral affordable housing

Located in Yonkers, NY, Whitney Young Manor, is a notable affordable housing complex with 195 apartments across 234,000 square feet and 12 stories. Built in 1974, the housing complex is now undergoing a $22 million makeover focusing heavily on decarbonization upgrades. This renovation aims to modernize the buildings by improving insulation and introducing a new heating and cooling system that’s energy efficient. These changes are expected to lower the buildings’ carbon footprint, enhance living conditions, and reduce energy costs. The developer, Paths Development LLC, is leveraging the recapitalization cycle of the property to upgrade its infrastructure and include decarbonization measures to meet its climate goals. 

Whitney Young Manor Building

Project Status

Planning

Under Construction

Monitoring & Evaluation

Investment

12 million

of total investment allocated to bring Whitney Young Manor to carbon neutrality by 2035.

Project Scale

Project has potential replication across a portfolio of 51 existing affordable housing developments managed by Paths.

Original facade
Testimonial

“The Empire Building Challenge is enabling Paths to pilot innovative approaches to decarbonization while at the same time helping to preserve affordable housing.”

Kenneth Spillberg

Head of Development

Paths Development LLC

Emissions Reductions

This project prioritizes intensive load reduction through envelope improvements and hydronic distribution to improve resident comfort while reducing carbon emissions, utility spend and maintenance costs.

A baseline assessment is key to understanding current systems and performance, then identifying conditions, requirements or events that will trigger a decarbonization effort. The assessment looks across technical systems, asset strategy and sectoral factors.

Building System Conditions
  • Equipment nearing end-of-life
  • New heat source potential
  • Comfort improvements
  • Indoor air quality improvefments
  • Facade maintenance
  • Resilience upgrades
  • Efficiency improvements
Asset Conditions
  • Recapitalization
  • Carbon emissions limits
  • Owner sustainability goals
Market Conditions
  • Technology improves
  • Utility prices change
  • Fuels phase out
Learn More

Whitney Young Manor is an aging affordable housing complex with open balconies, inefficient electric resistance baseboard heating, electric wall sleeve AC units, and gas-fired domestic hot water heaters. 

The project team believes that with care, planning, and the appropriate resources, retrofitting these residential buildings can  better serve  tenants, deliver  environmental benefits, and prove financially feasible for owners. Paths leverages the recapitalization cycle of the property to upgrade its infrastructure and include decarbonization measures to meet its climate goals. 

This project prioritizes intensive load reduction through envelope improvements and hydronic distribution to improve resident comfort while reducing carbon emissions, utility spending, and maintenance costs.

Effective engineering integrates measures for reducing energy load, recovering wasted heat, and moving towards partial or full electrification. This increases operational efficiencies, optimizes energy peaks, and avoids oversized heating systems, thus alleviating space constraints and minimizing the cost of retrofits to decarbonize the building over time.

Existing Conditions

This diagram illustrates the building prior to the initiation of Strategic Decarbonization planning by the owners and their teams.

Click through the measures under “Building After” to understand the components of the building’s energy transition.

Sequence of Measures

2024

2025

Building System Affected

  • heating
  • cooling
  • ventilation
Whitney Young Manor Building Before
Whitney Young Manor Building After
EIFS over uninsulated masonry, new windows, new roof
New hydronic piping drilled through common areas
Install 2 ASHPs to produce low temperature hot water and chilled water for in-unit FCUs
For use during power outages and extreme cold events
2-Pipe Low Temperature Fan Coils installed in units
Heat pump DOAS with ERV to recover heat from exhausted air to provide tempered supply air to the corridors
Install modular WSHPs supplied by hydronic loop
Install 18,000 gal sewage tank and use Sharc Energy’s heat recovery system and water-to-water heat pump to supplement central ASHPs
Learn More

Reduce Energy Load 

Whitney Young Manor demonstrates the benefits of over- cladding and hydronic distribution to enable heat pump technology: 

  • New hydronic distribution: High efficiency water-based distribution system, lower supply temperature 
    • The new hydronic distribution piping will enable the integration of different heating sources and allow heat sharing between end uses, such as DHW production during cooling season. The construction team plans to pilot cross-linked polyethylene (PEX) piping to reduce cost and improve durability. 
  • Dedicated Outside Air System (DOAS): decouple ventilation from heat and cooling systems 
  • Envelope Improvements: overclad, roof insulation and window replacement
    •  Over-cladding using Exterior Insulation and Finishing System (EIFS) helps reduce heat loss and air infiltration while avoiding façade maintenance costs associated with LL11. This measure is combined with the new Dedicated Outside Air System (DOAS) to make sure adequate fresh air is injected into the building. 

Recover Wasted Heat 

The project team plans to integrate different heat sources connected to the central hydronic piping. This includes centralized air source heat pumps, Wastewater Energy Transfer (WET) system and gas-fired condensing boilers as back-up.

  • Wastewater Heat Recovery: Recapture heat from wastewater using WSHP 
  • Energy Recovery Ventilator (ERV): Recapture heat from ventilation exhaust to condition make-up air

Electrification 

  • Central Air Source Heat Pump (ASHP): Maintain design temperatures for the hydronic loop
  • Water Source Heat Pump (WSHP) for Domestic Hot Water (DHW): DHW production supplied by hydronic loop 
  • Back-up gas condensing boiler: Provide supplemental heat during cold events as resiliency

Making a business case for strategic decarbonization requires thinking beyond a traditional energy audit approach or simple payback analysis. It assesses business-as-usual costs and risks against the costs and added value of phased decarbonization investments in the long-term.

Retrofit Costs

Decarbonization Costs

$12M

Capital costs of decarbonization measures. 

Avoided Risks

Business-as-Usual Costs

$1.92M

Energy cost savings, repairs and maintenance savings, BAU cost of system replacement and upgrades.

Avoided Risks

Business-as-Usual Risks

N/A

LL97 emissions fines don’t apply at this property.

Added Value

Decarbonization Value

$6.14M

Incentives from Empire Building Challenge, Low-Carbon Pathways Program, and ConEd Clean Heat.

Net Present Value

TBD

Net difference between the present value of cash inflows and outflows over a period of time.

Learn More

Paths Development LLC is a division of Paths, a full-scale, vertically integrated affordable housing developer, builder, and operator. Since 2004, the Paths team has created and preserved high-quality affordable housing across the U.S. that enhances communities and helps residents build better lives. With other 12,000 units across 9 states under management and more than 300 employees, Paths manages a suite of capabilities spanning the entire property life-cycle, including: development, construction, property management, maintenance, and security.

An emissions decarbonization roadmap helps building owners visualize their future emissions reductions by outlining the CO2 reductions from selected energy conservation measures. This roadmap is designed with a phased approach, considering a 20- or 30-year timeline, and incorporates the evolving benefits of grid decarbonization, ensuring a comprehensive view of long-term environmental impact.

Strategic decarbonization roadmap for Whitney Young Manor.
Learn More

More Like This

Case Study
Case Study

The Heritage

Fully occupied mixed-income property pursues facade retrofit
The Heritage Case Study
Case Study
Case Study

The Victory

Energy conservation analysis at midtown tower

Energy conservation analysis at midtown tower

The Victory Case Study
Case Study
Case Study

The Towers

Oldest US multifamily co-op transforms wastewater into clean energy
The Towers Case Study